The Ghost in the Gantt Chart
She flipped to Appendix C. A tiny paragraph detailed a modular caisson system that eliminated the rain delay. No one on the current team knew it existed. construction planning and management pdf
“From a PDF,” Riya said, smiling. “The one everyone ignored.” The Ghost in the Gantt Chart She flipped to Appendix C
Riya Kapoor, a junior project manager, stared at the chaos. The Ariana Bridge replacement was six weeks behind schedule, costs were spiraling, and the client was threatening legal action. Her boss, Mr. Mehta, had just walked off site after a screaming match with the structural engineer. ” Riya said